16.58kWh JK BMS Floor Standing Home Energy Storage Battery LiFePO4 Battery Cabinet with Wheels
| Nominal Voltage: | 51.2V | Rated Capacity: | 324Ah |
| Usable Energy: | 16.58 KWh | BMS Type: | Smart JK BMS, Active Balancing |
| Communication: | CAN / RS485 / RJ45 | Parallel Capability: | Up To 16 Units |
| Enclosure Rating: | IP20 Steel | Cabinet Form: | Floor Standing |
| Mobility: | 4 Lockable Universal Wheels | Cable Entry: | Side Cable Glands |
| High Light: | Floor Standing Wheeled Battery Cabinet,CAN RS485 Inverter Protocol,51.2V 324Ah Home Storage |
||
From Crate to Commissioned in Four Steps
LVB16WTC · floor standing IP20 cabinet on lockable wheels · standard CAN RS485 RJ45
Most residential storage delays happen before the electrical work starts: wall reinforcement surveys, bracket drilling, and a gateway that refuses to talk to the inverter. This unit removes those steps by being self-supporting, movable and protocol-standard. A single technician can land it, position it and commission it in one visit.
Installation sequence
- Roll and lock. Wheel the cabinet to the installation point, apply the four castor brakes, and confirm the floor is level.
- Land the DC side. Connect the battery cables through the side glands, observing the torque values on the terminal label.
- Land the signal side. Fit the communication cable to the CAN or RS485 port and select the matching inverter protocol in the BMS menu.
- Commission and record. Verify cell spread, confirm the inverter sees the pack, and log the BMS summary for the handover file.

Inverter compatibility
| Deye / Sunsynk | CAN, RS485 |
| Growatt | CAN, RS485 |
| Victron | CAN (VE.Can via BMS-Can) |
| Solis / Sofar | RS485 |
What is in the crate
- Cabinet with four lockable universal wheels fitted
- Battery DC cable set and terminal bolts
- Communication cable and RJ45 terminator
- Quick-start card with protocol selection table and torque values
Parallel and expansion
Up to 16 cabinets can be paralleled on one bus, so a 16.58kWh install can grow in identical steps without changing the DC topology or the commissioning procedure. Address setting is done on the BMS, and the master unit reports the aggregated pack to the inverter.

Supply and branding
EU deliveries leave the Poland warehouse in 3 to 7 days; China production runs ship in 15 to 20 working days. Bulk OEM / ODM orders carry customer branding on the cabinet, nameplate, manual and carton, with a shared accessory pack so field teams see one consistent product.
-
GDelivery: On time . This is a top notch company with nop notch caring , ethical and professional staff. Design: We all know they use the best Grade of cells and this product is best in class . Service: Unparalled dedication and professionalism of Tony Wen . Need I say more Quality: Creme de la creme . The very best.
-
GDelivery: Quality: Design: Service: This is a great company . With a great sales and support team . I have to mention Tony Wen . He is of exceptional professionalism and talent and dedication . On top of which this company manufacturers the very best batteries that are reliable , dependable and are easy to use.
-
GTout est parfait avec, en plus, un Wi-Fi interne pour une connexion internet et voir la progression de la batterie partout où on se trouve. Parfait.